SONIC WIND TUNNEL

...

SUPERSONIC WIND TUNNEL

Sl.No. Product Code Description
1 Elshaddai – Aero-SWT-002A Supersonic Wind Tunnel (Continous)

Compressor
Air Dryer
Air Tank
Computerised DAQ
1.2MATCH
Test Section Size 150mm x 150mm
PC should be provided by the institution
Send A Enquiry

SUB SONIC WIND TUNNEL

WIND TUNNEL.( Open Circuit Wind Tunnel )

Purpose

  • To study the Lift – Drag – Pitching forces on models.
  • To study the pressure distribution on models (Aerofoil, cylinder).
  • To study the drag - bluff bodies, automobile models.
  • To study the velocity in the test section
  • Smoke study around the models.(observation)

Send A Enquiry
...

Specifications

Type of tunnel Low speed, open circuit , suction type
Test section 300 X 300 X 1000 mm (length) with transparent windows.
Air velocity 0 – 30 m / Sec measured by pitot tube with traversing Mechanism.
Drive Variable speed AC motor of capacity 2HP TO 3HP, 1500 RPM With Thyristor controller
Contraction Ratio 9 : 1
Effuser In let section 1000 X 1000mm throat section of 300 X 300mm Length 2 meter made of FRP body with MS support
Diffuser Square to round section of 600mm dia length 2 mts. Made of M s body With MS support
Blower unit 600mm dia (I.D) M S Shell with housing for axial flow fan And rigid MS support/frame.
Fan 4 – 8 blades axial flow fan.
Overall size 1.2 X 2.2 X 5.5 mt Approx.
Control panel Independent control panel consisting of digital lift drag Indicator, digital velocity indicator, digital speed indicator, Digital ammeter and voltmeter, motor control drive, smoke And light control.
Power requirement A.C. 3 phases 440 Volt, 20 Amps with neutral and earth.

TUNNEL ACESSORIES

  • Manometer for calibration of velocity.
  • Variable speed AC motor of capacity 2HP TO 3HP, 1500 RPM

SPCIAL FEATURES

  • Tunnel does not need any civil work and easily transportable to any place of convenience.
  • The complete catalogue on operation, maintenance & theory is available with set of results on all experiments.
  • Commissioning of tunnel is done by our trained engineers.
  • Pre-dispatch inspection is offered at our works.

Complete equipment 30m/secvelocity
And tunnel made out of M S body.